Value |
BUILDING 1 |
BUILDING 2 |
SF |
95,800 SF |
104,772 SF |
BUILDING DIMENSIONS |
200’ X 450’ Front Load |
220’ X 450’ Front Load |
OFFICE |
North office pod: 2,750 SF |
South office pod: 2,750 SF |
LOAD BAY |
60' Deep, 54' Wide |
60' Deep, 54' Wide |
COLUMN SPACING |
54' X 46' 8" |
54' X 53' 4" |
CLEAR HEIGHT |
32' |
32' |
TRUCK COURT |
200' Shared |
200' Shared |
LEED |
Designed for LEED Certification |
Designed for LEED Certification |
PAVEMENT |
Concrete Paving, Reinforced on Stabilized Subgrade, Silicone Joint Sealants |
Concrete Paving, Reinforced on Stabilized Subgrade, Silicone Joint Sealants |
AUTO PARKING |
58 Spaces |
101 Spaces |
SLAB |
6" Reinforced Slab - 4,000 psi, FF50/FL35, 20-Mil Drago Wrap Vapor Intrusion Barrier |
6" Reinforced Slab - 4,000 psi, FF50/FL35, 20-Mil Drago Wrap Vapor Intrusion Barrier |
EXTERIOR WALLS |
Tilt-Up Concrete Load-Bearing Walls, Caulked and Painted Both Sides |
Tilt-Up Concrete Load-Bearing Walls, Caulked and Painted Both Sides |
STAIRS |
Galvanized Dock Stairs |
Galvanized Dock Stairs |
ROOFING |
60-Mil TPO Roofing, Mechanically Fastened with R-12 |
60-Mil TPO Roofing, Mechanically Fastened with R-12 |
ROOF DECKING |
White Primed Roof Decking, Pinned to Joists, Columns Painted |
White Primed Roof Decking, Pinned to Joists, Columns Painted |
WINDOWS |
Skylights, 4'x8' Prismatic, Every Other Central Bay, Clerestory Load Bay Windows |
Skylights, 4'x8' Prismatic, Every Other Central Bay, Clerestory Load Bay Windows |
DOCK DOORS |
20 Dock Doors Per Building, Vertical Lift, 3” Track w Z-Guards, View Window, Bumpers |
20 Dock Doors Per Building, Vertical Lift, 3” Track w Z-Guards, View Window, Bumpers |
DRIVE-IN DOORS |
Two Drive-Up Ramps Per Building with 12’x14’ Vertical Lift Doors |
Two Drive-Up Ramps Per Building with 12’x14’ Vertical Lift Doors |
FIRE PROTECTION |
ESFR Fire Sprinkler Systems, Interior Pressurized Loop. Fire Alarm Monitor’s Flow and Tamper Switches, Only |
ESFR Fire Sprinkler Systems, Interior Pressurized Loop. Fire Alarm Monitor’s Flow and Tamper Switches, Only |
COOLING |
Make-Up Air Units (MAU) for Freeze Protection + 0.08CFM/SF Ventilation via Intake Louvers |
Make-Up Air Units (MAU) for Freeze Protection + 0.08CFM/SF Ventilation via Intake Louvers |
WAREHOUSE LIGHTING |
All lighting is LED including Cooper Metalux High Bay, 25 Foot Candles Ave Min |
All lighting is LED including Cooper Metalux High Bay, 25 Foot Candles Ave Min |
ELECTRICAL SERVICE |
480 Volt 3-Phase Power – Ampacity Available for Any Load Required |
480 Volt 3-Phase Power – Ampacity Available for Any Load Required |
TI ELECTRICAL |
TI Will Include Outlets Between Every Other Dock Door |
TI Will Include Outlets Between Every Other Dock Door |